Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project
Oluwole Alfred OLATUNJI
《工程管理前沿(英文)》 2018年 第5卷 第3期 页码 334-346 doi: 10.15302/J-FEM-2018011
This paper uses project organizational theories to draw lessons from a historic megaproject, the Ajaokuta Steel Plant (ASP). Archival reports on the ASP were explored to identify the unique attributes of the project; the political wrangling that underplayed its evolution, its economic significance and organizational impacts. Findings suggest the goals of the ASP project were, and still are, unambiguous. Failure occurred as socio-political forces aggravated the project’s complex milestones. Stakeholders were impatient with pre-project investigations. During planning, owners ignored opinions that were contrary to their expectations. While delays lingered, pressures from the global economy weakened the project’s motivation to succeed. These combined to turn the project’s outcomes into a chaotic situation that triggered dire implications. Despite about 1400% overrun in cost, the success achieved on the plant was 28% at commissioning. Contractors remained on site until eight years after commissioning. Six key elements of the 482 items in the ASP project contract were not delivered nearly 40 years on. A simplistic look at these suggests poor planning is the main problem. However, planning issues is not entirely strange in greenfield projects. The paper draws strength from project organization theories to explain what was poor about the planning. Socrates’ generic management theory was used to explain the role of leadership in the failure of the ASP project. McGregor’s Theory X and Theory Y explain the significance of stakeholders’ integration in megaprojects. Systems and chaos theories were used to explain the sensitivity of the ASP project to uncertainties. Narratives on these combine well to inspire stakeholders of megaprojects on where and how to seek courage in making effective plans that can help achieve success in complex projects. While normative literature only recognizes project success in a definitive perspective, this study provides insights from failure as an instrument to trigger sublime reflections.
关键词: industrial projects megaprojects Nigeria project organizational theories steel plant
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
《工程管理前沿(英文)》 2022年 第9卷 第1期 页码 117-134 doi: 10.1007/s42524-020-0115-3
关键词: project scheduling resource leveling between projects constrained resources game theory Benders decomposition
Social responsibility in infrastructure mega-projects: A case study of ecological compensation for
Zheming LIU, Liangyan WANG, Zhaohan SHENG, Xinglin GAO
《工程管理前沿(英文)》 2018年 第5卷 第1期 页码 98-108 doi: 10.15302/J-FEM-2018084
关键词: infrastructure mega-projects social responsibility ecological compensation Hong Kong-Zhuhai-Macao Bridge Sousa chinensis
Development and advances in modular multilevel converter based HVDC projects in China
《工程管理前沿(英文)》 页码 183-189 doi: 10.1007/s42524-022-0248-7
关键词: high voltage direct current power converter power systems renewable energy ultra-high voltage
Optimal risk allocation in alliance infrastructure projects: A social preference perspective
Xiang DING, Qian LI
《工程管理前沿(英文)》 2022年 第9卷 第2期 页码 326-336 doi: 10.1007/s42524-020-0145-x
关键词: public project contract design risk sharing inequity aversion governance
Conceptualising the nexus of projects, finance and capacity in construction business
Arun BAJRACHARYA, Stephen Olu OGUNLANA, Cheng Siew GOH, Hai Chen TAN
《工程管理前沿(英文)》 2018年 第5卷 第3期 页码 289-297 doi: 10.15302/J-FEM-2018021
This paper addresses a research question on why construction companies fail in their business. Starting with the concept of growth and capacity underinvestment archetype, a new and operational systems thinking model is developed. The conceptual systems thinking model includes a set of causal structure that can explain various modes (including the growth and failure modes) of business performance of small and medium construction companies. Mainly the three components – projects, finance and capacity – and the understanding of their nexus (or causal inter-relationships) are found to be sufficient to reveal different performance modes in construction business. Further, the three operational aspects, namely, the business growth or decline process; the situation of financial and other capacity resource consumption; and the management of projects, finance and other capacity resources have been identified as the inter-related core and integral aspects of construction business. The three inter-related core aspects could actually include and explain different possible range of business situations, policies and practices in a construction company.
关键词: performance of construction business projects finance capacity systems thinking
Naomi J. Brookes
《工程管理前沿(英文)》 2014年 第1卷 第3期 页码 241-245 doi: 10.15302/J-FEM-2014033
Large Scale Infrastructure Projects: The Art of Project or Change Management?
Geert Letens,Kurt Verweire,Peter De Prins
《工程管理前沿(英文)》 2016年 第3卷 第3期 页码 197-202 doi: 10.15302/J-FEM-2016033
关键词: large scale project management organization development and change batteries of change model
Major bridge projects——a multi-disciplinary approach
Klaus H. OSTENFELD, Erik Y. ANDERSEN
《结构与土木工程前沿(英文)》 2011年 第5卷 第4期 页码 479-495 doi: 10.1007/s11709-011-0137-3
关键词: bridges materials climate risk safety environment socioeconomics traffic CO2 energy life cycle society aesthetics
Conservation and adaptive reuse of industrial heritage in Shanghai
ZHANG Song
《结构与土木工程前沿(英文)》 2007年 第1卷 第4期 页码 481-490 doi: 10.1007/s11709-007-0065-4
关键词: evolution industrial international industrial retrospective Shanghai
Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
Mario VANHOUCKE
《工程管理前沿(英文)》 2018年 第5卷 第2期 页码 133-149 doi: 10.15302/J-FEM-2018088
关键词: project management project scheduling resource constraints PERT/CPM RCPSP
Construction management and technology innovation for main projects of Quanzhou Bay Bridge
Jun DU, Fangwen WENG
《工程管理前沿(英文)》 2021年 第8卷 第1期 页码 151-155 doi: 10.1007/s42524-020-0147-8
关键词: construction management technology innovation UHPC trestle panel
郭峰,刘慧
《中国工程科学》 2011年 第13卷 第8期 页码 97-102
文章将功能系数法与广泛应用于管理评价的逻辑框架法进行综合运用,认为项目及组织的可持续发展是建设项目协调管理的最高境界,从目标协调管理绩效、组织协调管理绩效、利益相关方协调管理绩效及项目和组织可持续发展性4个方面建立了建设项目协调管理绩效评价指标体系,并给出各指标的计算方法,运用功能系数法计算建设项目协调管理绩效综合评价功能系数,从而有效量化了对建设项目协调管理绩效的综合评价。最后,通过算例研究,验证了指标体系构建方法及各指标计算方法的可行性,这个方法可以有效地衡量协调管理的功能。
Shuai LI, Da HU, Jiannan CAI, Hubo CAI
《工程管理前沿(英文)》 2020年 第7卷 第3期 页码 413-425 doi: 10.1007/s42524-019-0045-0
关键词: financial incentives public–private partnerships energy infrastructure projects real option optimization uncertainty
WANG Jianguo, JIANG Nan
《结构与土木工程前沿(英文)》 2007年 第1卷 第4期 页码 474-480 doi: 10.1007/s11709-007-0064-5
关键词: historical industrial industrial building implementation adaptive-reuse empirical
标题 作者 时间 类型 操作
Causations of failure in megaprojects: A case study of the Ajaokuta Steel Plant project
Oluwole Alfred OLATUNJI
期刊论文
Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
期刊论文
Social responsibility in infrastructure mega-projects: A case study of ecological compensation for
Zheming LIU, Liangyan WANG, Zhaohan SHENG, Xinglin GAO
期刊论文
Optimal risk allocation in alliance infrastructure projects: A social preference perspective
Xiang DING, Qian LI
期刊论文
Conceptualising the nexus of projects, finance and capacity in construction business
Arun BAJRACHARYA, Stephen Olu OGUNLANA, Cheng Siew GOH, Hai Chen TAN
期刊论文
Large Scale Infrastructure Projects: The Art of Project or Change Management?
Geert Letens,Kurt Verweire,Peter De Prins
期刊论文
Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
Mario VANHOUCKE
期刊论文
Construction management and technology innovation for main projects of Quanzhou Bay Bridge
Jun DU, Fangwen WENG
期刊论文
Real option-based optimization for financial incentive allocation in infrastructure projects under public–private
Shuai LI, Da HU, Jiannan CAI, Hubo CAI
期刊论文